6/19/08 the retaining wall footer form is ready for
the concrete to be poured
|

6/19/08 a concrete pump makes it possible to pour
the conrete from beyond the fence
|
6/19/08 the concrete is pumped through a long tube
and guided into the form
|

6/19/08 the hose is swung from side to side of the
form
|

6/19/08 close up
|
6/19/08 the concrete is smoothed and leveled while
pouring continues
|

6/19/08 three truckloads of concrete were used to
pour the footer
|
6/20/08 the footer after drying overnight
|
6/19/08 the footer
|
|

6/27/08 a form is built for the retaining wall
|

6/19/08 concrete is poured between the two parallel
walls of the form
|

6/27/08 the same pump over the fence technique is
used
|
|

6/30/08 the new retaining wall
|

6/30/08 the retaining wall will keep our parking
lot from sliding down the hill
|

6/30/08 the retaining wall with the form removed
|